Managing Project Templates

Build a project once, then launch it for any number of plans or companies. How to create, edit, launch, schedule, copy and export project templates.

Written by Andrew Flowers

Overview

A project template is a reusable blueprint for work your firm does again and again, like census collection, client onboarding or a 5500 filing. A template holds the tasks, who they're assigned to, due dates, automations and data fields. When you launch it, CX creates a project with all of that already set up, for one client or hundreds at once.

Why use templates

  • Every client gets the same steps, so nothing gets missed.

  • Tasks are assigned and dated automatically on launch.

  • Automations run at the right step without anyone remembering to do them.

  • You can launch for many plans at once, or schedule launches to repeat every year.

Find your templates

  1. Click Library in the left sidebar, then Projects.

  2. The list shows each template's Title, Tags, Tasks, Automated, Triggers and Schedules. Click More > Configure Columns to add Active Projects, Active Tasks or Created.

  3. Use the search and tag filters to narrow the list. Double-click a title to rename it.

Create a template

  1. On the Projects page in the Library, click New.

  2. Enter a Project template title and click Create. The template opens.

  3. On the Overview tab, set a Default Project Lead (a user, role or group) and add a Description.

Start from a curated template: click More > Explore Curated Templates, open a template to see its tasks, and click Download Template to add it to your library. If it includes automations, you'll be asked to re-configure them for your firm.

Add tasks

  1. Open the template and go to its tasks. On wide screens they show in a side panel.

  2. Click Add Task and enter a Description.

  3. Choose the Assignee: Project Lead (the default), a specific user, a role or a queue. Roles let the right person get the work for each client.

  4. Set the Due Date: a number of days after launch (0 means the launch date), or a fixed date.

  5. Add options as needed:

    • Client: makes it a client task that shows in the Client Portal. Pick a client task type, such as Questionnaire, Upload Payroll Report or Fill & Sign Documents.

    • Internal: pick an internal task type, such as Review Census Data or Reconcile Assets.

    • Data: requires data fields to be filled in before the task can be completed.

    • Milestone: marks a plan-year milestone complete when the task is done.

  6. To automate the step, click Attach Automation or pick one of the Recommended Automations.

  7. Click Add Task.

Branches: click Add Branch to group tasks that should only run under certain conditions. Set the condition under Activate this group only when.... Deleting a branch also deletes the tasks inside it.

Bulk actions: use Bulk Actions to copy or delete several tasks at once. Right-click to paste copied tasks above or below another task.

Other template tabs

  • Data: the project data fields every launched project starts with.

  • Triggers: launch the template automatically when a public form is submitted, a client request comes in, or a file is uploaded.

  • Assignees: how many tasks each assignee has to do, in progress and done across active projects.

  • Activity: a log of changes to the template.

  • Overview: also shows the projects launched from this template and their progress.

Launch a template

  1. Open the template and click Launch.

  2. Targets: choose Plans, Companies or Deals and pick them one by one or with filters. You can also launch from a File (click Download manifest template to get the format), or launch a Standalone project with no client.

  3. Data: fill in or review the project data values.

  4. Details: set the Project Lead and Due Date. For plans, you can link the new projects to a plan-year project.

  5. Validate: fix anything listed under These problems will stop the launch, and review Worth checking before you launch.

  6. Timing: choose Launch Now or Schedule Launch, then click Launch.

Projects are created within a few moments. If the template sends emails, the launch window shows an estimated send time and warns you if a sender's mailbox isn't connected.

Schedule repeat launches

In the Timing step, choose Schedule Launch and set a Launch Date, Time and Frequency: Just Once, Daily, Bi-Weekly, Monthly or Annually. Scheduled launches show on the template's Schedules tab, where you can edit or cancel them. Targets chosen by filter are checked at launch time, so new plans that match are included automatically.

Copy, export and delete

Open the template and click its ... menu:

  • Duplicate project template: makes a copy named "(Copy)".

  • Export template: downloads the template's tasks.

  • Export clients without project: downloads a list of clients who don't have a project from this template.

  • Delete project template: projects already launched from it keep running. This can't be undone.

To export several templates at once, click More > Export templates on the list. Pick the templates and columns, then click Export to download an Excel file with one sheet per template.

Tips

  • Use Project Lead and roles as assignees instead of specific people, so the template works for every client.

  • Use days after launch for due dates, so they're correct whenever you launch.

  • Test a new template on one client before launching it in bulk.

  • Can't see Projects under Library? Ask your admin to check that your permission group has access to templates.